Sidebar

YJENG-Online YJENG-Online
  • HOME
  • FACTORY
  • TRADING
  • SAS/CSCS
  • SERVICE
  • PROJECT
  • Contact
  • Download
  • EPCEPC

Time synchronized phasor measurement

รายละเอียด
สร้างเมื่อ: 16 กุมภาพันธ์ 2556

                    P847 PMU

Time synchronized phasor measurement (i.e. synchrophasors) involves measuring electric system frequencies and phase angles very precisely from 20-120 times every second at various points across the electrical grid over large geographic areas. Synchrophasor measurements are time stamped using very precise time sources such as the Global Positioning Systems (GPS) satellite signals. This provides very detailed and precise time synchronized measurements of the state of the electrical grid.

Read more …

SA61850 for utility (MEA)

รายละเอียด
สร้างเมื่อ: 08 มกราคม 2556

TCCL to supply IEC61850 Substation Automation to MEA, Metropolitant Electricity Authority of Thailand, for Bangkrachao and Rassburana Substation. the SA system will be a full scheme PACiS/DS Agile ALSTOM latest IEC61850 control system. It would comply to MEA's most strengthen requirement of "Substation Automation System based on IEC61850 standard". the sytem due to be delivered Suptember 2013 and commsionign end of 2013 latest.

Substation Equipment for LAO

รายละเอียด
สร้างเมื่อ: 08 มกราคม 2556

TCCL supplied a package of 123kV CT,CVT,LA and 22kV GCB, CT, VT to LAO's Nong Bong substation. The equipment passed the commissioning end of last year December 2012 and the substation is live now.

 

Read more …

SAS IEC61850 to private SPP

รายละเอียด
สร้างเมื่อ: 03 มกราคม 2556

TCCL to supply a fully IEC61850 Substation Automation System to one of private industry. The system will be dual redundant RSTP protocal with 20 IEDs. The system provides a maximum overall control and monitoring performance based on new IEC61850 protocol and latest MiCOM hardware revision "M" with dual Fiber Optic Ethernet Communication.

The scheme due to be delivered on March and commisisoning in April 2013.

 

Gulf SPP's SRTU for 4th substation are under FAT

รายละเอียด
สร้างเมื่อ: 30 สิงหาคม 2555

Gulf SPP's representative and contractor has witness the FAT for their SRTU cubicle today. The SRTU system was successful pass the FAT with minor comment. The panel due to be delivered end of August 2012.

Read more …

เนื้อหาอื่นๆ...

  1. Alstom Launches PRP Redundancy in its MiCOM Relays, Bay Controller & Switches
  2. MiCOM ALSTOM Protection Relays with Process Bus in Q3 2012
  3. PACiS/DS Agile project
  4. Substation Security
  5. MiCOM S1 Agile
  6. The Fastest In The Market...
  7. C264 news
  8. DS Agile...
  9. P74x latest developement
  10. New Era of Protection
  11. Redefining_MiCOM
  12. 2nd INNOVATION SEMINAR
  13. CYBER- SECURITY
  14. New Alstom Grid Selector Guide 2012
  15. NEW Software 04 for MiCOM P642/3/5
  16. Alstom Grid - MiCOM S1 Studio v3.4.1 - NEW Release to Download
หน้าที่ 5 จาก 9
  • เริ่มต้น
  • ก่อนหน้า
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • ต่อไป
  • สุดท้าย

YIP IN TSOI & JACKS LTD. | Electrical Division
Phone : +668-4657-5996.+669-5652-9699 | Fax : +662-353-8686  | Office : +662-353-8664
E-mail : wiroj.bo@yipjacks.co.th | Web : www.yjsupport.com

Bootstrap is a front-end framework of Twitter, Inc. Code licensed under MIT License. Font Awesome font licensed under SIL OFL 1.1.
Powered by T3 Framework